TAN THUONG HYDROPOWER PLANT
TAN THUONG HYDROPOWER PLANT
General information
- Project: Tan Thuong Hydropower Project
- Employer: Duc Long Gia Lai Group Joint Stock Company
- Main contractor: Song Da 9 Joint Stock Company
- Location: Tan Lam commune, Di Linh district and Tan Thanh commune, Lam Ha district, Lam Dong province
- Total capacity: 27 MW
- Construction period: 2016 - 2018
Scope of works performed by Song Da 9
Total quantity performed by Song Da 9:
- Excavation: 696,635 m3
- Back filling: 66,895 m3
- Concrete: 36,197 m3
Scope of works:
- Left bank rolling weir, right bank rolling weir, spillway
- Headrace canal and pressure tank
- Intake and underground part of the plant
- Ground part of the plant and architecture
- Tailrace canal
- Water diversion (cofferdam)
- General works (preparation works)